References

Our
work.

Pilostone’s assignments and the programmes its founder led before setting up the firm.

IKEA Troyes: site coordination within a consortium
Project managementTroyes, France2026

[ 01/03 ] · IKEA

IKEA Troyes: site coordination within a consortium

  • Coordination
  • Consortium
  • Fire safety

Scheduling, management and coordination of an IKEA store fit-out, within a consortium alongside the general contractor and the furniture installer, through to the store opening on 30 September 2026.

Show project
MINISO: works permit regularisation in shopping centres
Fire-safety complianceCréteil Soleil · Cergy 3 Fontaines2026

[ 02/03 ] · MINISO France

MINISO: works permit regularisation in shopping centres

  • Fire-safety compliance
  • Works permit
  • Shopping centre

Compliance review and support with regularising the works permits of two MINISO stores in shopping centres, with an action plan aligned on the fire-safety commission timetable.

Show project
NORMAL: building out the store network
Retail rolloutFranceBefore Pilostone

[ 03/03 ] · NORMAL · founder’s track record

NORMAL: building out the store network

  • Retail rollout
  • Multi-site
  • HQ reporting

As Concept & Construction Director at NORMAL, Arnaud Poyet led the opening of 166 of the brand’s stores in France: around 50 projects a year, €35M annual CAPEX and a team of five. When he left, the network numbered around 250 stores.

Show project

Your project